Ordinance 33-2019 Building & Building Regulations ORDINANCE NO. 33-2019
AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF PALM BEACH,
PALM BEACH COUNTY, FLORIDA, AMENDING THE TOWN CODE OF
ORDINANCES AT CHAPTER 18, BUILDINGS AND BUILDING REGULATIONS,
ARTICLE I, IN GENERAL, DIVISION III, PLANS AND PERMITS, BY ADDING
SECTION 18-86, CONSTRUCTION STAGING AND TRUCK LOGISTICS PLAN;
PROVIDING FOR SEVERABILITY; PROVIDING FOR THE REPEAL OF
ORDINANCES IN CONFLICT; PROVIDING FOR CODIFICATION; AND
PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF PALM BEACH,
PALM BEACH COUNTY, FLORIDA, AS FOLLOWS:
Section 1. Chapter 18, Buildings and Building Regulations, of the Town Code of
Ordinances, Article I, In General, Division III, Plans and Permits, is hereby amended by
adding a new section, 18-86, as follows:
Sec. 18-86. —Construction Staging and Truck Logistics Plan.
Any project that requires major Arcom or LPC approval shall include in their plan set a
construction staging and truck logistics plan. This plan shall be submitted as part of all major
Architectural Committee and Landmark Preservation Committee projects that demonstrates how
the owner and contractors will idents specific locations on and adjacent to the project site for
parking, material storage, deliveries, dumpster,portable toilets, tire cleaning area, silt fence,
etc. This staging and truck logistic plan should indicate the proposed route for truck traffic to
best ingress and egress the property depending upon its location on the Island, including the
roads and bridges used. The plan should attempt to identify the size of larger vehicles that might
be used for construction or deliveries, the estimate of the number of trucks, and a rough schedule
of construction listing some of the major construction benchmarks (foundation, block deliveries,
concrete pours, roof truss deliveries and truss setting, window & door deliveries and
installation,final landscape installation, etc.). This information could be presented in the form
of a critical path method(CPM) chart,placed on the staging and truck logistics plan page. This
plan should represent the best estimate of the site layout and of the truck information available
at the time of plan submittal and may be revised during the construction project.
Section 2. Severability. If any provision of this Ordinance or the application therof is held
invalid, such invalidity shall not affect the other provisions or applications of this Ordinance
which can be given effect without the invalid provisions or applications, and to this end the
provisions of this Ordinance are hereby declared severable.
Section 3. Repeal of Ordinances in Conflict. All other ordinances of the Town of Palm
Beach, Florida, or parts therof, which conflict with this or any part of this Ordinance are
hereby repealed.
Section 4. Codification. This Ordinance shall be codified and made a part of the official
Code of Ordinances of the Town of Palm Beach, Florida.
Section 5. Effective Date. This Ordinance shall take effect immediately upon its passage
and approval, as provided by law.
PASSED AND ADOPTED in a regular, adjourned ses, ion of the Town Council of the Town
of Palm Beach, Florida, on the First Reading this 1 H day of � -i-, 2019; and for the
Second and Final Reading on this t t+k day of 5 t,�ktmb x2019.
. 41.no
G 1 . Conigli , Mayor "elDanielle H. Moore, Town Council President
C:Xif--?-atd., , >
Margaret A. Zeit4 an, Council President Pro Tem
10 , ,
- •
Juli A a o S), Council ► ember
0 „twit
ATTEST: Lewis S.W. Crampto , Town Council Member
4(1.04-111.1114--• - •
Ka`titeen Do xiinguez, Town Clerk Bobbie Lindsay, To Council Member